Augustana recently announced the decision to renovate Erickson Residence Hall in the 2023-2024 school year. This is a choice that excites students who will have improved air conditioning and plumbing when...
Walking into nearly any building on Augustana’s campus, a student never really knows what to expect, temperature-wise. It can feel like one is still outside in freezing temperatures or in the Sahara...
Augustana’s Viking Plaza, also known as the Lower Quad, has been under construction for the past few weeks. Specifically, construction has been focused on two main spots on campus: minor construction...
Augustana College First-Years have the choice of three residence halls: Andreen, Seminary and Westerlin. Students are given rooms at random during housing selection by Residential Life. The issue is that...
Temperatures on the second floor of Old Main were cooler than other parts of the building on Monday as a result of a failed compressor in one of the building’s heating systems.
Faculty and students were...
Augustana’s Board of Trustees approved architectural plans for Westerlin Residence Hall earlier this month, which include air conditioning in dorm rooms among other renovations for the building.
The...
Westerlin Hall is having heating problems after the boiler malfunctioned. A backup boiler is now in place and maintenance is planning to have the problem fixed by 6 p.m. and have heat by 10 p.m.
Christina...